April 8, 2016
​
The Miller-Driscoll Building Committee has approved an adjustment to the project's construction schedule and phasing, resulting in a new projected completion date of Labor Day 2017, in time for the start of the 2017-2018 school year and 3+ months ahead of the current schedule. Abatement activity will be included in these changes.
All abatement will be performed when school is not in session (during summer and holiday breaks while the renovation is underway), and will be followed by the renovation of that same area. Students will reoccupy the space only after the renovation of that area is complete, which will be weeks or months after the abatement activity has occurred. 


OVERVIEW
Hazardous building materials investigation summary, Abatement specification, SIP, Abatement process, October 12, 2015
trc_report_-_2015-10-12_md_hazmat_overall_summary.pdf
File Size: 301 kb
File Type: pdf
Download File

Design Review, Hazardous Materials Investigation Summary & Abatement Process (p. 8-17), Construction Phasing presentation to Miller-Driscoll parents, neighbors and Wilton community, October 14, 2015
presentation_-_2015-10-14_design_review_hazmat_investigation_summary_abatement_process_construction_phasing.pptx
File Size: 6517 kb
File Type: pptx
Download File


ABATEMENT / TESTING /SURVEY REPORTS & NOTICES
TRC, an environmental consulting firm, is managing the investigation and abatement of hazardous materials at the Miller-Driscoll building site.

ATC Associates, an environmental consulting firm, conducted work for the forensic evaluation of the Miller-Driscoll buildings in 2012 as well as three year inspections and asbestos management update in 2015 .
​

April 16, 2017 - Indoor air sampling Apr 14
trc_report_-_2017-04-14_indoor_air_sampling.pdf
File Size: 551 kb
File Type: pdf
Download File

trc_report_-_2017-04-14_esml_indoor_air_sampling.pdf
File Size: 116 kb
File Type: pdf
Download File

December 31, 2016 - Indoor air sampling Dec 23, 24 26-29, 31
trc_report_-_2016-12-31_indoor_air_sampling_dec_23_24_26-29_31.pdf
File Size: 3048 kb
File Type: pdf
Download File

December 18, 2016 - Indoor air sampling Dec 16, 17
trc_report_-_2016-12-18_indoor_air_sampling_dec_16_17.pdf
File Size: 9758 kb
File Type: pdf
Download File

December 11, 2016 - Indoor air sampling Dec 10, 11
trc_report_-_2016-12-11_indoor_air_sampling_dec_10_11.pdf
File Size: 14457 kb
File Type: pdf
Download File

December 4, 2016 - Indoor air sampling Dec 3
trc_report_-_2016-12-04_indoor_air_sampling_dec_3.pdf
File Size: 7628 kb
File Type: pdf
Download File

November 27, 2016 - Indoor air sampling Nov 23, 25, 26​
trc_report_-_2016-11-27_indoor_air_sampling_nov_23_25_26.pdf
File Size: 4074 kb
File Type: pdf
Download File

​November 21, 2016 - Notice of Abatement in unoccupied construction area during holiday weekend
md_abatement_notice_2016-11-21.docx
File Size: 12 kb
File Type: docx
Download File

November 11, 2016 - New Addition IAQ Nov 7, Nov 9, Nov 11
trc_report_-_2016-11-11_new_addition_indoor_air_sampling_nov_7_nov_9_nov_11.pdf
File Size: 8097 kb
File Type: pdf
Download File

September 1, 2016 - Miller IAQ Aug 29 & Sep 1
trc_report_-_2016-09-01_miller_indoor_air_aug_29_sep_1.pdf
File Size: 10634 kb
File Type: pdf
Download File

 August 31, 2016 - Miller-Driscoll abatement & testing Jun 15-Aug 22
trc_report_-_2016-08-31_miller_driscoll_hazmat_activities_june_15-august_22.pdf
File Size: 14977 kb
File Type: pdf
Download File

August 29, 2016 - Driscoll IAQ Aug 25
trc_report_-_2016-08-29_driscoll_indoor_air_august_25.pdf
File Size: 11900 kb
File Type: pdf
Download File

May 13, 2016 - Caulking/glazings/building substrates sampling for PCBs Apr 12, 14, 15
trc_report_-_2016-05-13_caulk_glazing_building_substrates_sampling.pdf
File Size: 8674 kb
File Type: pdf
Download File

February 26, 2016 - Abatement Feb 20
trc_report_-_2016-02-26_hazardous_materials_oversight_february_20.pdf
File Size: 3580 kb
File Type: pdf
Download File

February 18, 2016 - Abatement Feb 10-15
trc_report_-_2016-02-18_hazardous_materials_oversight_february_break.pdf
File Size: 3700 kb
File Type: pdf
Download File

February 15, 2016 - Safe to reoccupy notice
trc_letter_-_2016-02-15_safe_to_reoccupy_school.pdf
File Size: 134 kb
File Type: pdf
Download File

January 22, 2016 - Lead in air analysis
trc_report_-_2016-01-22_lead_in_air_analysis.pdf
File Size: 6920 kb
File Type: pdf
Download File

December 1, 2015 - December break abatement
trc_report_-_2016-01-12_hazardous_materials_oversight_holiday_break.pdf
File Size: 921 kb
File Type: pdf
Download File

December 11, 2015 - Temporary classrooms follow up indoor air sampling
trc_report_-_2015-12-11_temporary_classrooms_follow_up_indoor_air_sampling.pdf
File Size: 371 kb
File Type: pdf
Download File

December 11, 2015 - Pre-construction baseline air sampling
trc_report_-_2015-12-11_pre-construction_baseline_air_sampling.pdf
File Size: 394 kb
File Type: pdf
Download File

December 2, 2015 - Temporary classroom indoor air sampling
trc_report_-_2015-12-02_temporary_classrooms_indoor_air_sampling.pdf
File Size: 498 kb
File Type: pdf
Download File

July 2015 - Pre-demolition/renovation investigative survey for hazardous building materials Miller Driscoll Elementary School
trc_md_school_hazbuildingmaterials_inspection_survey_final_rev._07-13-15.pdf
File Size: 19983 kb
File Type: pdf
Download File

May 4, 2015 - Focused soil investigation
trc_report_-_2015-5-4_focused_soil_investigation.pdf
File Size: 2922 kb
File Type: pdf
Download File

April 28, 2014 - Full IAQ
trc_report_-_2014-04-28_trc_md_full_iaq_report.pdf
File Size: 5918 kb
File Type: pdf
Download File

April 28, 2014 - Radon
trc_report_-_2014-04-28_trc_md_radon_testing.pdf
File Size: 6347 kb
File Type: pdf
Download File

April 15, 2014 - Radon & IAQ
trc_report_-_2014-04-15_trc_md_radon_and_iaq_report.pdf
File Size: 100 kb
File Type: pdf
Download File

August 2012 - Microbial and indoor environmental quality assessment
atc_associates_2012-08_microbial___indoor_environmental_quality_assessment.pdf
File Size: 5983 kb
File Type: pdf
Download File

August 2012 - Survey to identify asbestos-containing materials
atc_associates_2012-08_survey_to_identify_asbestos_containing_materials.pdf
File Size: 8572 kb
File Type: pdf
Download File


CONFORMANCE SPECS
Asbestos abatement
section_028213_asbestos_abatement.pdf
File Size: 370 kb
File Type: pdf
Download File

Lead hazard control activities
section_028313_lead_paint_activity.pdf
File Size: 381 kb
File Type: pdf
Download File

Removal and disposal of PCBs
section_028433_pcb_abatement.pdf
File Size: 352 kb
File Type: pdf
Download File

Removal and disposal of PCB contaminated soil
section_026123_pcb_soil_removal.pdf
File Size: 267 kb
File Type: pdf
Download File

Transport and disposal of hazardous materials
section_028100_hazmat_handling.pdf
File Size: 282 kb
File Type: pdf
Download File


DOCUMENTS FOR KOHLER
Documents and information requested by the Kohler family regarding the abatement of hazardous materials at Miller-Driscoll.​​

ENVIRONMENTAL SITE ASSESSMENT
trc_final_m-d_school_phase_i_esa_report_03-17-2015.pdf
File Size: 20299 kb
File Type: pdf
Download File


LEGAL INVOICES
Shipman and Goodwin October 2014 - November 2015
shipman_and_goodwin_10-14_to_11-15.pdf
File Size: 1432 kb
File Type: pdf
Download File


MANAGEMENT
Driscoll three-year inspection and asbestos management plan update
atc_driscoll_asbestos_management_report_2015.pdf
File Size: 8620 kb
File Type: pdf
Download File

Miller three-year inspection and asbestos management plan update
atc_miller_asbestos_management_report_2015.pdf
File Size: 9845 kb
File Type: pdf
Download File

Self-implementation cleanup plan
trc_-_2015-05-22_md_sip.pdf
File Size: 23647 kb
File Type: pdf
Download File


PROPOSALS
Proposal for pre-construction baseline air sampling
trc_proposal_-_2015-12-01_pre-construction_baseline_air_sampling.pdf
File Size: 875 kb
File Type: pdf
Download File

The Miller-Driscoll Building Project is the multi-phase, comprehensive renovation 
of the Miller-Driscoll School building that  serves Pre-K - Grade 2 students in Wilton, CT.
MDBPinfo@wiltonct.org

Miller-Driscoll School, 217 Wolfpit Road, Wilton, CT 06897

This website is maintained by the Miller-Driscoll Building Committee and community volunteers. 
Project rendering images courtesy of TSKP Studio, Architects.